We have a garage built in 1992, which sits right on two boundaries. Because of this it is a 'unique' roof design, which has caused weather tightness issues. (we are in the process of trying to sort this now).   We have had to pull the mouldy gib off the internal walls, with a plan to replace them, as well as insulate and add some power points.

 

 

 

I applied for the property file from the council, and the two boundary walls are fire walls. Lined with 16mm Gib fyreline (that we have now removed)

 

 

 

Q1) Do we legally have to follow the architect plans from 1992 for the fire walls.. specifies 16mm fyreline, types of screws etc.

 

Q2) Do we have to follow current day building code for fire walls? I have information from the James Hardie website, specifying 10mm fyreline

 

Q3) Are there any restrictions on having electrical cables in fire walls?

 

 

 

We want to insulate the walls in the process, this will go through council consent, as we are doing a few other things to the garage as well.


Create new topic
7404 posts

Uber Geek
+1 received by user: 3867


  Reply # 2055124 12-Jul-2018 14:59
Send private message

Are you DIY the consent process?  If not, then I'd suggest to forget about trying to find out all the fine details and leave that to the regd designer.

 

There are restrictions/ and special requirements for putting power outlets etc in fire rated walls - but it can be done.

 

It's normal that not only generic type of screws, but Gib branded screws must be used.

 

I assume that you'd need to meet current code, you might get away with using old plans (to an old code) if you were just doing the lining replacement as a separate one-off maintenance job, but if a building inspector was to be coming on site to inspect other stuff and see this work unconsented and not on the plans for the whole job, he/she'll probably make life very miserable.


311 posts

Ultimate Geek
+1 received by user: 85

Trusted
Emergency Management

  Reply # 2055151 12-Jul-2018 15:34
Send private message

Has your insurance company instructed you to take off the firewall? if not then I would be talking to them now about cover while its being fixed.


182 posts

Master Geek
+1 received by user: 25


  Reply # 2055409 12-Jul-2018 22:39
Send private message

Usually for fire rated walls the flush boxes are metal and have an intumescent pad in them. The holes for the cables into the fire wall are sealed with an intumescent fire sealant.


Create new topic

Twitter »

Follow us to receive Twitter updates when new discussions are posted in our forums:



Follow us to receive Twitter updates when news items and blogs are posted in our frontpage:



Follow us to receive Twitter updates when tech item prices are listed in our price comparison site:



Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.

Alternatively, you can receive a daily email with Geekzone updates.