  Reply # 1625216 7-Sep-2016 18:16
Send private message

If you want the timing to be exact, the only option is to use the same signal the lights use. That will no doubt be near on impossible. You won't be allowed to connect to the circuit.

If you want it within seconds, you need to detect the lights turning on. This too could be quite tricky depending on the lamp type.


What you need to decide is, what is an acceptable time difference. You need to be realistic about this.

If you can tolerate around 5 mins in the winter and maybe as much as 30 mins (I don't actually know, its a guess) in the height of summer, a daylight switch is the best option.




Location: Dunedin

412 posts

Ultimate Geek
+1 received by user: 100


  Reply # 1625219 7-Sep-2016 18:37
Send private message

these signals are sent over ripple control. so this is by far your best way of doing it.

 

are the the buildings on separate meters? if not then you could do this with one RCR controlling the whole lot!

 

http://www.oriongroup.co.nz/assets/Customers/RippleSignalGuide.pdf





 The views expressed by me are not necessarily those of my employer


 
 
 
 


282 posts

Ultimate Geek
+1 received by user: 76


  Reply # 1625392 8-Sep-2016 08:50
Send private message

BTW - this is a heritage lighting project for our small Arrowtown CBD.

 

 

 

So does this mean the area you are looking to light up will be accessible to the public, and you therefore want the timing to be exact to avoid any misconceptions that there is something wrong?




254 posts

Ultimate Geek
+1 received by user: 1


  Reply # 1625435 8-Sep-2016 09:28
One person supports this post
Send private message

Thanks everyone for your input but now have got it sorted. Briefly, the local power contractor to Council is supplying ripple control units for each building - FOC. These will be controlled on the same circuit as the street lights.




Why work on Wednesday and stuff up 2 good long weekends

2019 posts

Uber Geek
+1 received by user: 1131


  Reply # 1625947 8-Sep-2016 18:36
Send private message

I'm genuinely impressed (and glad) you got it sorted so easily.




Location: Dunedin

412 posts

Ultimate Geek
+1 received by user: 100


  Reply # 1625950 8-Sep-2016 18:40
Send private message

stuffed: Thanks everyone for your input but now have got it sorted. Briefly, the local power contractor to Council is supplying ripple control units for each building - FOC. These will be controlled on the same circuit as the street lights.

 

 

 

even better when it's FOC bearing in mind AFAIK they are still there property just like the meters.





 The views expressed by me are not necessarily those of my employer


1 | 2 
Filter this topic showing only the reply marked as answer View this topic in a long page with up to 500 replies per page Create new topic



Twitter »

Follow us to receive Twitter updates when new discussions are posted in our forums:



Follow us to receive Twitter updates when news items and blogs are posted in our frontpage:



Follow us to receive Twitter updates when tech item prices are listed in our price comparison site:



Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.


Geekzone Live »

Our community of supporters help make Geekzone possible. Click the button below to join them.

Support Geezone on PressPatron



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.

Alternatively, you can receive a daily email with Geekzone updates.