Geekzone: technology news, blogs, forums
Guest
Welcome Guest.
You haven't logged in yet. If you don't have an account you can register now.
Southern Cross announces further 20% capacity prices reduction
Posted on 14-Jan-2013 13:27 | Tags Filed under: News



Southern Cross prices have again fallen and the company continues to expand its international capacity as it continues to upgrade the network. “We have reduced our capacity prices by another 20%”, said Sales and Marketing Director Ross Pfeffer. “This will be our tenth major price reduction since 2000 and over the period our price decline has averaged more than 22% per year.

“It’s been pleasing to see big increases in data caps and declines in retail data cost for internet users in both Australia and New Zealand over the last year. Our continued initiatives to increase supply and reduce price are designed to encourage this process and to support the needs of Australia's NBN and New Zealand's UFB” Pfeffer noted.

The Southern Cross Network provides uninterrupted hi-speed connectivity to US based internet content. Constructed as a protected twin cable network of 28,500 kilometres of undersea cable the Southern Cross cable network has become a major regional asset for reliable high-speed broadband.

The latest price decline marks the second stage of the eighth major capacity expansion programme since 2001 and it is due for completion in February 2013. This Stage is based on Ciena’s 40Gbps transmission equipment and takes total lit capacity on the Southern Cross Network to 2 Tbps.

The third stage of the current expansion programme is being implemented concurrently and it is based on Ciena's 100 Gbps transmission equipment. 100G technology is already installed on some network segments and will take lit capacity to 2.6 Tbps by June 2013.

Ross Pfeffer commented that, “the increasing simplicity of equipment upgrades provides Southern Cross with the ability to frequently and rapidly expand capacity. We currently have the potential to go to at least 7 Terabits per second, about 30 times higher than our original design capability.”

“Our capacity potential will increase dramatically over the next few years when transmission equipment speeds are expected to quadruple. With ongoing and dramatic advances in technology Southern Cross has the ability to stay well ahead of demand over the longer term”. While continuing to reduce cost and to expand supply, Southern Cross remains dedicated to continuous circuit availability. “Our protected circuits continue to provide 100% availability and the performance of the six fibre pairs and 500 repeaters on the diverse cable network is better today than when constructed more than 10 years ago” he noted.


More information: http://www.southerncrosscables.com...




comments powered by Disqus


Trending now »

Hot discussions in our forums right now:

iPhone 8/iPhone X, impressions?
Created by surfisup1000, last reply by kharris on 26-Sep-2017 17:20 (444 replies)
Pages... 28 29 30


Car pulling left - even after alignment
Created by Paul1977, last reply by blakamin on 26-Sep-2017 21:47 (48 replies)
Pages... 2 3 4


Auckland Airport fuel supply obliterated by digger
Created by Batman, last reply by scottjpalmer on 26-Sep-2017 22:10 (228 replies)
Pages... 14 15 16


Driving an automatic - do you use one foot or both?
Created by geekIT, last reply by blakamin on 26-Sep-2017 22:56 (145 replies)
Pages... 8 9 10


Electrical standards question
Created by delroynitz, last reply by Bung on 26-Sep-2017 22:22 (17 replies)
Pages... 2


Could a production electric car reach 500 KPH anytime soon?
Created by kingdragonfly, last reply by kotuku4 on 26-Sep-2017 16:32 (27 replies)
Pages... 2


vodafone shutting down email?
Created by FatFurryGuy, last reply by Rickles on 26-Sep-2017 15:31 (301 replies)
Pages... 19 20 21


Fire Brigade Access To Property
Created by Geektastic, last reply by MaxLV on 27-Sep-2017 01:06 (22 replies)
Pages... 2