Your detention requirements for holding back anything greater than 10% AEP (classical 1 in 10) is going to be huge. A single catchpit with 300mm outlet and 900mm sump will carry approimately 90 linear meters of road with a width of 3.5m which is 315 litres per mm of rain per hour, anything above this and it will overflow.