Hi Guys,
Our new freestanding bath has arrived its designed to fit against the wall so I'll be taking out a old decades old steel bath.
The floor below the old bath looks fine apart from the different wood paneling the new bath has a centre mount waste with no overflow.
New Bath is adjustable up to 19 mm.
Is there a best practice way to install these or is it just a matter of removing the old bath tiding up the area where needed and drilling a hole in where the centre of the bath will be. Looking online it seems everything gets siliconed the bath feet the bath surround etc.
If there are any gotchas or if you have some pearls of wisdom, I would love to know before I need to install.
Thanks in Advance.