ajobbins
5052 posts

Uber Geek

Trusted

  #816683 13-May-2013 12:57
Send private message

So....AT claims that Snapper was slowing things down, but now Snapper are out, things seem to be going slower and costing even more money?

At the time it was made to sound like Thales was all ready to go.....




Twitter: ajobbins




nigelj
856 posts

Ultimate Geek


  #816715 13-May-2013 13:16
Send private message

ajobbins: So....AT claims that Snapper was slowing things down, but now Snapper are out, things seem to be going slower and costing even more money?

At the time it was made to sound like Thales was all ready to go.....


It sounds more like arguments over who will own the readers on the buses (as opposed to fixed equipment on AT properties for trains/ferries).   Under the old agreement my understanding was that each bus company would buy their own from an approved list, AT to speed it up slightly with all the messing around wanted to buy them (I assume cheaper per unit) out of a new budget and lease-to-own them with the bus companies.

What it sounds like is that Auckland Council said "Here is a fifth of what you need, make it do something" which is what we've landed on now.

I can see why Auckland Transport would want to do what they've done, there is a big win to making sure everything is the same, but I do think it's disappointing that they demanded more money for it, like you I was under the impression that all these little bits were sorted.  Either way, I've seen the equipment on the Northern Express obviously before the 'closed trial' started as the driver's console was showing errors such as "EOD processes not performed for X days" and red screens et al, but they did look pretty nice, and hopefully worth the wait.

Also as a side note, why didn't they do a public trial on the City Circuit, they are 0-value transactions, they could have had both side by side, and monitored the performance quite nicely before a private trial.  (my 10c)

sbiddle
30853 posts

Uber Geek

Retired Mod
Trusted
Biddle Corp
Lifetime subscriber

  #816749 13-May-2013 14:06
Send private message

ajobbins: So....AT claims that Snapper was slowing things down, but now Snapper are out, things seem to be going slower and costing even more money?

At the time it was made to sound like Thales was all ready to go.....


Thales were never supplying the bus terminals. They were a combination of Snapper terminals for the NZ bus fleet however all the other bus companies were had opted for a different brand of terminal (the name of the manufacturer excapes me at present). These other terminals were not able to be made to work either, and were canned at the same time as Snapper as they hadn't even been ordered from the manufacturer due to delays in finalising some of the specs.

A new contract was then given to Thales to supply terminals for all buses.



nigelj
856 posts

Ultimate Geek


  #816752 13-May-2013 14:11
Send private message

sbiddle:
ajobbins: So....AT claims that Snapper was slowing things down, but now Snapper are out, things seem to be going slower and costing even more money?

At the time it was made to sound like Thales was all ready to go.....


Thales were never supplying the bus terminals. They were a combination of Snapper terminals for the NZ bus fleet however all the other bus companies were had opted for a different brand of terminal (the name of the manufacturer excapes me at present). These other terminals were not able to be made to work either, and were canned at the same time as Snapper as they hadn't even been ordered from the manufacturer due to delays in finalising some of the specs.

A new contract was then given to Thales to supply terminals for all buses.


It was the Wayfarer ones (Parkeon brand), who have supplied the majority of bus terminals in Auckland pre-Snapper - I think even NZ Bus had the Parkeon/Wayfarer terminals.

Edit: I don't recall that the Parkeon contract was cancelled due to failure to integrate, I was under the impression that it was just decided that it as easier to buy the bulk needed from Thales. (My memory may be failing me)

1 | ... | 10 | 11 | 12 | 13 | 14 | 15 
View this topic in a long page with up to 500 replies per page Create new topic





News and reviews »

Air New Zealand Starts AI adoption with OpenAI
Posted 24-Jul-2025 16:00


eero Pro 7 Review
Posted 23-Jul-2025 12:07


BeeStation Plus Review
Posted 21-Jul-2025 14:21


eero Unveils New Wi-Fi 7 Products in New Zealand
Posted 21-Jul-2025 00:01


WiZ Introduces HDMI Sync Box and other Light Devices
Posted 20-Jul-2025 17:32


RedShield Enhances DDoS and Bot Attack Protection
Posted 20-Jul-2025 17:26


Seagate Ships 30TB Drives
Posted 17-Jul-2025 11:24


Oclean AirPump A10 Water Flosser Review
Posted 13-Jul-2025 11:05


Samsung Galaxy Z Fold7: Raising the Bar for Smartphones
Posted 10-Jul-2025 02:01


Samsung Galaxy Z Flip7 Brings New Edge-To-Edge FlexWindow
Posted 10-Jul-2025 02:01


Epson Launches New AM-C550Z WorkForce Enterprise printer
Posted 9-Jul-2025 18:22


Samsung Releases Smart Monitor M9
Posted 9-Jul-2025 17:46


Nearly Half of Older Kiwis Still Write their Passwords on Paper
Posted 9-Jul-2025 08:42


D-Link 4G+ Cat6 Wi-Fi 6 DWR-933M Mobile Hotspot Review
Posted 1-Jul-2025 11:34


Oppo A5 Series Launches With New Levels of Durability
Posted 30-Jun-2025 10:15