Geekzone: technology news, blogs, forums
Guest
Welcome Guest.
You haven't logged in yet. If you don't have an account you can register now.


View this topic in a long page with up to 500 replies per page Create new topic
1 | 2 
backfiah
219 posts

Master Geek


  #2111084 19-Oct-2018 16:36
Send private message

wellygary:

 

wratterus:

 

Who thought transmission gully was a bad idea now? tongue-out

 

 

Don't worry it's still going to bring out the "all the stuff on those trucks should be moved on trains" brigade

 

 

I'll bite...

 

What's your big argument against the seemingly sensible idea of reducing pressure on our roads by better utilising our woefully-underused freight rail lines?




DarthKermit

5346 posts

Uber Geek

Trusted

  #2111119 19-Oct-2018 17:37
Send private message

It's a pity that many successive governments have done very little to alleviate this joke of a state highway into our nation's capital.

 

In 2020 once Transmission Gully and the expressway thru to Otaki are both open, at least there'll be an alternative route on this side of the north island.

 

Further north, this bridge this bridge on SH1 is the only road crossing of the Waikawa stream. I'm not a civil engineer but that stream don't exactly look as wide as the Amazon river to me. It's frigging incredible that nothing else exists (except the railway crossing) to head north.


mattwnz
20141 posts

Uber Geek


  #2111173 19-Oct-2018 19:23
Send private message

wellygary:

 

wratterus:

 

Who thought transmission gully was a bad idea now? tongue-out

 

 

Don't worry it's still going to bring out the "all the stuff on those trucks should be moved on trains" brigade

 

 

 

 

Haven't they decided to put a toll on the new road, which I don't believe was the original plan? That will likely make people who are more strapped for cash travel on the  older routes. I do think that some of these big trucks carrying things such as logs across the hill to Wellngton should be using trains, or they should restrict them to certain times. At the moment the hill road  is barely wide enough, and some trucks appear to  have to cross the lane to turn corners. The wear and tear on some roads I suspect is higher from these massive trucks.




DjShadow
4084 posts

Uber Geek

ID Verified
Trusted

  #2111205 19-Oct-2018 20:56
Send private message

Just seen this small video linked on Facebook, the trucks are rolling again: https://www.facebook.com/RedsHairdressing/videos/577900529308550/?t=0

 

Edit: Just seen a comment that 350 Trucks are now rolling into Wellington


amiga500
1484 posts

Uber Geek
Inactive user


  #2111270 20-Oct-2018 05:24
Send private message

Typical NZ, talk about the need for a new road for 40 or 50 years before actually starting works.


  #2111355 20-Oct-2018 11:17
Send private message

DarthKermit:

 

It's a pity that many successive governments have done very little to alleviate this joke of a state highway into our nation's capital.

 

In 2020 once Transmission Gully and the expressway thru to Otaki are both open, at least there'll be an alternative route on this side of the north island.

 

Well, nearly.
The current plan will only have the existing route from where Transmission Gully ends just north of Paekakariki to Raumati South where the Sandhills Expressway starts. I think there ought to be at least a two-lane parallel link through that area, but that would have to go through QE II park, so difficult
frown

 

 

 

DarthKermit:

 

Further north, this bridge this bridge on SH1 is the only road crossing of the Waikawa stream. I'm not a civil engineer but that stream don't exactly look as wide as the Amazon river to me. It's frigging incredible that nothing else exists (except the railway crossing) to head north.

 

That was probably going to be replaced by the Otaki - Levin "Road of National [party] Importance", but since that's now almost certainly not going to happen this side of 2025, if ever, maybe replacing that bridge and the Manakau Railway Overbridge just south will be done as a separate 'Safety Improvements' project.


Geektastic
17942 posts

Uber Geek

Trusted
Lifetime subscriber

  #2111612 20-Oct-2018 20:05
Send private message

Just wait until The Big One...





 
 
 

Cloud spending continues to surge globally, but most organisations haven’t made the changes necessary to maximise the value and cost-efficiency benefits of their cloud investments. Download the whitepaper From Overspend to Advantage now.
Geektastic
17942 posts

Uber Geek

Trusted
Lifetime subscriber

  #2111613 20-Oct-2018 20:05
Send private message

Just wait until The Big One...





Geektastic
17942 posts

Uber Geek

Trusted
Lifetime subscriber

  #2111614 20-Oct-2018 20:06
Send private message

PolicyGuy:

DarthKermit:


It's a pity that many successive governments have done very little to alleviate this joke of a state highway into our nation's capital.


In 2020 once Transmission Gully and the expressway thru to Otaki are both open, at least there'll be an alternative route on this side of the north island.


Well, nearly.
The current plan will only have the existing route from where Transmission Gully ends just north of Paekakariki to Raumati South where the Sandhills Expressway starts. I think there ought to be at least a two-lane parallel link through that area, but that would have to go through QE II park, so difficult
frown


 


DarthKermit:


Further north, this bridge this bridge on SH1 is the only road crossing of the Waikawa stream. I'm not a civil engineer but that stream don't exactly look as wide as the Amazon river to me. It's frigging incredible that nothing else exists (except the railway crossing) to head north.


That was probably going to be replaced by the Otaki - Levin "Road of National [party] Importance", but since that's now almost certainly not going to happen this side of 2025, if ever, maybe replacing that bridge and the Manakau Railway Overbridge just south will be done as a separate 'Safety Improvements' project.



New roads are only built in Auckland now.





DarthKermit

5346 posts

Uber Geek

Trusted

#2112023 21-Oct-2018 19:02
Send private message

Leave it to Stuff:

 

Businesses are still feeling the impact of Friday's mammoth 17-year closure of State Highway 1, as they scramble to pull back lost time and fill late deliveries.


1 | 2 
View this topic in a long page with up to 500 replies per page Create new topic





News and reviews »

Air New Zealand Starts AI adoption with OpenAI
Posted 24-Jul-2025 16:00


eero Pro 7 Review
Posted 23-Jul-2025 12:07


BeeStation Plus Review
Posted 21-Jul-2025 14:21


eero Unveils New Wi-Fi 7 Products in New Zealand
Posted 21-Jul-2025 00:01


WiZ Introduces HDMI Sync Box and other Light Devices
Posted 20-Jul-2025 17:32


RedShield Enhances DDoS and Bot Attack Protection
Posted 20-Jul-2025 17:26


Seagate Ships 30TB Drives
Posted 17-Jul-2025 11:24


Oclean AirPump A10 Water Flosser Review
Posted 13-Jul-2025 11:05


Samsung Galaxy Z Fold7: Raising the Bar for Smartphones
Posted 10-Jul-2025 02:01


Samsung Galaxy Z Flip7 Brings New Edge-To-Edge FlexWindow
Posted 10-Jul-2025 02:01


Epson Launches New AM-C550Z WorkForce Enterprise printer
Posted 9-Jul-2025 18:22


Samsung Releases Smart Monitor M9
Posted 9-Jul-2025 17:46


Nearly Half of Older Kiwis Still Write their Passwords on Paper
Posted 9-Jul-2025 08:42


D-Link 4G+ Cat6 Wi-Fi 6 DWR-933M Mobile Hotspot Review
Posted 1-Jul-2025 11:34


Oppo A5 Series Launches With New Levels of Durability
Posted 30-Jun-2025 10:15









Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.