Hi there,
Apologise if this has been answered anywhere.
I'm going to be moving into a brand new build in Tawa (Chorus is LFC) and fibre has been run to the building already and I believe the ETP is already installed. For the installation of the connection I have it designed so the Chorus Tech will need to only drill through the wall and put the ONT on the other side (power point is already there).
Will I likely need separate scoping and install visits or given that it is just an ONT install can that be done in one visit?
Cheers