Bung:qubasiasty: The bad part is that the fence is not even mine, but the neighbors.
Not a boundary fence yet what appears to be your building hard against it??
qubasiasty: <snip> I'm hoping they will find a team to get me sorted faster than 2 weeks.
InstallerUFB:qubasiasty: <snip> I'm hoping they will find a team to get me sorted faster than 2 weeks.
Judgeing from the photos (the terminal ones) it appears that there is only 1 tube in there for a conection and that this one has alrady been used (likely for a neigbour) - what the up to two weeks delay will be is for the approval (from design/records) and a job created to get another boundary tube, off the multiway tubeing along the road, connected up so that your connection can be completed (this work isnt done by the installers but by a specialist build team from the local network support company)
Whatifthespacekeyhadneverbeeninvented?
DarthKermit: ^^^
So is it buried next to the fence now?
qubasiasty:DarthKermit: ^^^
So is it buried next to the fence now?
Still on the fence but on the very bottom of it tho, I found out that the fence is shared and we can do whatever we want on our side apaprently. I didn't want to bury it as I have planted stuff in that spot and the tech told me that they need to bury it at least 600mm under the ground which would damage the roots of the plants there.
chevrolux:qubasiasty:DarthKermit: ^^^
So is it buried next to the fence now?
Still on the fence but on the very bottom of it tho, I found out that the fence is shared and we can do whatever we want on our side apaprently. I didn't want to bury it as I have planted stuff in that spot and the tech told me that they need to bury it at least 600mm under the ground which would damage the roots of the plants there.
Lol... now it's at a pefect spade hitting level. Wouldn't want to be doing any gardening in there now, that little tiny tube will be wrecked after it's first hit with a spade.
xlinknz: I had my UFB installed today [Wgtn]
Excellent job done both externally [duct under concrete] and internally
That said it was obvious the tech from Transfield [sub to Chorus] was onto it and good and went the extra mile. I only have praise for the work that Chorus has done at my place.
Mine you I was there for all 4 hours of the install to provide oversight. The only gotcha was they don't carry UTP crimping tools with them !
Here is the result just now
graemeh:xlinknz: I had my UFB installed today [Wgtn]
Excellent job done both externally [duct under concrete] and internally
That said it was obvious the tech from Transfield [sub to Chorus] was onto it and good and went the extra mile. I only have praise for the work that Chorus has done at my place.
Mine you I was there for all 4 hours of the install to provide oversight. The only gotcha was they don't carry UTP crimping tools with them !
Here is the result just now
Lucky you. I'm in Wellington and I'm still waiting.
I've had two visits from Chorus so far. The second was with a Wellington Electricity contractor on 22 December and they still haven't done the WE paperwork yet. According to Chorus "Wellington Electricity is on leave until 12 January" so I'm hoping they will approve use of the power poles some time next week.
What is really frustrating is that the Chorus contractor on visit no 2 told me they had 6 crews sitting around waiting for work and Chorus is not sending anything through.
Oh well, at least it is a nice weather in Wellington and my outside jobs are progressing well.
xlinknz:graemeh:xlinknz: I had my UFB installed today [Wgtn]
Excellent job done both externally [duct under concrete] and internally
That said it was obvious the tech from Transfield [sub to Chorus] was onto it and good and went the extra mile. I only have praise for the work that Chorus has done at my place.
Mine you I was there for all 4 hours of the install to provide oversight. The only gotcha was they don't carry UTP crimping tools with them !
Here is the result just now
Lucky you. I'm in Wellington and I'm still waiting.
I've had two visits from Chorus so far. The second was with a Wellington Electricity contractor on 22 December and they still haven't done the WE paperwork yet. According to Chorus "Wellington Electricity is on leave until 12 January" so I'm hoping they will approve use of the power poles some time next week.
What is really frustrating is that the Chorus contractor on visit no 2 told me they had 6 crews sitting around waiting for work and Chorus is not sending anything through.
Oh well, at least it is a nice weather in Wellington and my outside jobs are progressing well.
I ordered mine from my RSP 22 or 23rd Dec and installed yesterday way quicker than I expected
How come it is the Wellington Electricity ?
I thought that Chorus had Transfield do all Wgtn jobs [and that changes next month to Downers]
xlinknz: <snip>
How come it is the Wellington Electricity ?
I thought that Chorus had Transfield do all Wgtn jobs (and that changes next month to Downers)
mckenndk: If you wanted to run your own UFB conduit from the street to your house what would people recommend?
At least if you do it you know it will be done to at least your standard.
Dion
|
|
|