Too long for here, I posted about the problems this rollout is causing: http://elpie.posterous.com/other-side-of-ultra-fast-broadband-rollout
It seems that Chorus doesn't talk to local councils about street access.
On another issue -
According to the contractors, the footpath on both sides of my driveway, and my driveway, are all to be dug up. I've had a large hole on the right side since January, with no walking access in that direction. The latest letter says work is expected to be completed 20th April.
A contractor told me a cabinet or box of some kind is going outside my home. I haven't been able to get any further details except for the information that their plans are cast in stone and won't be changed. My plans include a change to my vehicle crossing, which is supported by city council. If this cabinet or whatever goes in where the contractor indicated its going to be right in the middle of my driveway. Apparently it can then be moved at my expense.
I've called Chorus and been told I should get a call back this Wednesday. They suggested that if I don't hear back from them I should call again Friday (yeah, right, on Good Friday).
What boxes/cabinets are being installed locally? Anyone know?