So the wheels are in motion to get UFB installed into the house, Chorus visit is scheduled but to avoid disappointment on the day maybe someone here can let me know what sort of obstacles they might come across. As per photos below, I’m down a right of way. Distance from the green pedestal to the grey one at the edge of my property is about 15m, then about 10m from there to where the current telecoms cable enters the house. A few concrete and tarseal driveways to go under.

My main concerns are:
• Will I need consents from the neighbours (and for what exactly)?
• Is any of the concrete or tarseal going to have to be smashed/cut or can they use existing conduit (if there is any, I’m not sure)?







"I have noticed even people who claim everything is predestined, and that we can do nothing to change it, look before they cross the road." -  Stephen Hawking


Create new topic
4203 posts

Uber Geek


  # 871345 3-Aug-2013 19:26
Send private message

InstallerUFB will confirm but if the duct is fine from the fibre pedestal to the local DP then they won't be doing any civil work and therefore won't require consent from your neighbours.

If the duct is no good then yes it is a long drawn out process of getting approval from everyone and can take quite some time.

832 posts

Ultimate Geek


  # 871379 3-Aug-2013 20:27
Send private message

Because you live down a right of way things are a little bit different than if the UFB communial network went past your gate.

I would suspect that when you get a visit from the Chorus contractor to come and scope your job - if there isnt a suitable duct/s that can be used to provide connection/s for you and your neighbours then your job will be put on hold and sent back to Chorus for there action -

You will find my reply to similar question Here http://www.geekzone.co.nz/forums.asp?forumid=135&topicid=122127

If there is a suitable duct then the installation team will have to dig up around your pillar (the Grey mushroom terminal) to access it and the end of your service conduit to install the ribbonet tube from the pedistall to the side of your house.

In both cases there will be concrete/seal abd grass dug up and reinstateted.




IF you PM me your actual address ill take a look at the network plans for you

 
 
 
 




2001 posts

Uber Geek


  # 871382 3-Aug-2013 20:33
Send private message

Thank you, sounds quite encouraging. If the only digging required turns out to be near the pillars and the side of the house that will be fairly straight forward, it's just grass or dirt covered by gravel in those areas, but I won't count my chickens until I get the nod from the Chorus folk of course.

Apologies, had a scout around but didn't see the other thread. I'll read it now.




"I have noticed even people who claim everything is predestined, and that we can do nothing to change it, look before they cross the road." -  Stephen Hawking


675 posts

Ultimate Geek


  # 871588 4-Aug-2013 15:20
Send private message

InstallerUFB: Because you live down a right of way things are a little bit different than if the UFB communial network went past your gate.

I would suspect that when you get a visit from the Chorus contractor to come and scope your job - if there isnt a suitable duct/s that can be used to provide connection/s for you and your neighbours then your job will be put on hold and sent back to Chorus for there action -

You will find my reply to similar question Here http://www.geekzone.co.nz/forums.asp?forumid=135&topicid=122127

If there is a suitable duct then the installation team will have to dig up around your pillar (the Grey mushroom terminal) to access it and the end of your service conduit to install the ribbonet tube from the pedistall to the side of your house.

In both cases there will be concrete/seal abd grass dug up and reinstateted.




IF you PM me your actual address ill take a look at the network plans for you


Just a quick question, On that which may also be of interest to OP.

In the case of a ROW situation does a tech normally show up and complete a quote type assessment or do they normally only show up when intending to proceed with the work?

832 posts

Ultimate Geek


  # 871615 4-Aug-2013 16:37
Send private message

lucky015: Just a quick question, On that which may also be of interest to OP.

In the case of a ROW situation does a tech normally show up and complete a quote type assessment or do they normally only show up when intending to proceed with the work?



Asumeing its Chorus UFB

If your address is obviously down a ROW (with more than one house down the ROW - this also includes mutipule subdivided sections -)  then usualy the job is intercepted before it ends up being sent out to be scoped and is sent to Chorus concents and then on for design and build before going to he installer  - if it isnt obvious then it will be sent out for scopeing (and hopefully this is done before install date) and they have to send it back

but even sometimes the job goes to concents (concent is given) but is still sent out for the install teams to scope the job because it isnt obvious that design & build work is required and they might then send it back to have design & build work done befor they can procced


a rule of thumb is

1 possible End User connection -> Install team handle the civils work

2 or more End User Connections -> Design & Build teams handle the civils work before the install teams take over

675 posts

Ultimate Geek


  # 871645 4-Aug-2013 17:58
Send private message

InstallerUFB:
lucky015: Just a quick question, On that which may also be of interest to OP.

In the case of a ROW situation does a tech normally show up and complete a quote type assessment or do they normally only show up when intending to proceed with the work?



Asumeing its Chorus UFB

If your address is obviously down a ROW (with more than one house down the ROW - this also includes mutipule subdivided sections -)  then usualy the job is intercepted before it ends up being sent out to be scoped and is sent to Chorus concents and then on for design and build before going to he installer  - if it isnt obvious then it will be sent out for scopeing (and hopefully this is done before install date) and they have to send it back

but even sometimes the job goes to concents (concent is given) but is still sent out for the install teams to scope the job because it isnt obvious that design & build work is required and they might then send it back to have design & build work done befor they can procced


a rule of thumb is

1 possible End User connection -> Install team handle the civils work

2 or more End User Connections -> Design & Build teams handle the civils work before the install teams take over


Yes, This is Chorus UFB.

So most likely up a shared driveway (2 houses up a long driveway) they would request consent first?

My main reason for querying this is that you mentioned existing ducting may be able to be used which may be able to sidestep requiring consent from the neighbors.

832 posts

Ultimate Geek


  # 871654 4-Aug-2013 18:21
Send private message

lucky015:
Yes, This is Chorus UFB.

So most likely up a shared driveway (2 houses up a long driveway) they would request consent first?

My main reason for querying this is that you mentioned existing ducting may be able to be used which may be able to sidestep requiring consent from the neighbors.


Yep if there is existing ducting/conduiting it may be suitable for use for UFB and concent to install new may not be required 


- if you would like me to take a paper look in your case just send me a pm with your address details? You can then pass this on (if there is ducting) to your RSP when you request and that will help speed up the process 


 
 
 
 




2001 posts

Uber Geek


  # 873461 7-Aug-2013 19:53
Send private message

After some offline advice from InstallerUFB, and reading the Chorus website, it seems more than likely that I will need neighbour's consents. I've started the ball rolling on this.

When the fibre was laid in the street they left quite a mess on the grass verge that was never put right, until the neighbour herself ended up forking out money for topsoil and grass-seed. She is now, justifiably, reluctant to sign the consent form in case they make more mess.

My question now is, how much digging is required around the green pillar for the install to get the fibre from there to the house. If I can convince her that it's only a square foot or two I might be able to persuade her to sign the consent.

Would this photo


from this thread http://www.geekzone.co.nz/forums.asp?forumid=135&topicid=106897 be representative of the size hole they may need to dig? Or maybe someone else can provide some piccies of an install.




"I have noticed even people who claim everything is predestined, and that we can do nothing to change it, look before they cross the road." -  Stephen Hawking


4929 posts

Uber Geek

Trusted

  # 875282 11-Aug-2013 09:51
Send private message

floydbloke: When the fibre was laid in the street they left quite a mess on the grass verge that was never put right, until the neighbour herself ended up forking out money for topsoil and grass-seed. She is now, justifiably, reluctant to sign the consent form in case they make more mess.


Could you perhaps gaurentee in writing to her that you'll pay to put it right should they leave a mess again?




Whatifthespacekeyhadneverbeeninvented?


810 posts

Ultimate Geek
Inactive user


  # 875288 11-Aug-2013 10:47
Send private message

floydbloke: When the fibre was laid in the street they left quite a mess on the grass verge that was never put right, until the neighbour herself ended up forking out money for topsoil and grass-seed. She is now, justifiably, reluctant to sign the consent form in case they make more mess.


That's pretty shoddy, restoration of the verge should be a requirement of their consents from the local council.



2001 posts

Uber Geek


  # 875323 11-Aug-2013 12:18
One person supports this post
Send private message

DarthKermit: 

Could you perhaps gaurentee in writing to her that you'll pay to put it right should they leave a mess again?


I went and had a friendly chat with her and gave her a verbal guarantee that I would ensure everything would be restore to a proper state.  She was happy with that and has since signed the consent form.  Good progress (got 4 consents out of 7 so far) and neighbourly harmony remains intact.  




"I have noticed even people who claim everything is predestined, and that we can do nothing to change it, look before they cross the road." -  Stephen Hawking




2001 posts

Uber Geek


  # 924729 31-Oct-2013 12:58
Send private message

Thought I'd post a quick update on this.
As advised by several helpful folk, getting consents from neighbours, or should I say property owners of the neighbouring houses, is indeed the time-consuming part. There was one sticky one in particular (he was Ok with it, just difficult to get the signed form back from him, he lives in a different city).

My advice is, if you live in a property with some form of shared access and you're looking at getting fibre, enage with your neighbours early, explain what your plans are and give them a copy of the consent form (available from the Chorus website), to help move things along. Chorus (or one of their thrid parties) will send them the consent forms (if required) when you sign up for a UFB install but a few weeks may pass before this happens, it will move quicker if you do it yourself.

Back to my installation, the fibre (ducts) have now been extended to the boundary of my section so I now have a nice green square pedestal. Lifting the lid of this, inside it is the original grey one, as well as 4 nice brightly colored straws for the fibre. One for me, and the three others for the neighbours eventually I suspect. This 'build' work took less than a day. I had received a note in the mailbox that they were going to do this at the beginning of this week, but they actually turned up a week and a half early. I was out of town so didn't get to speak to them. They didn't have to cut any concrete or tarseal and did a very nice job leaving it tidy. They even fixed up the mess mentioned above that one of the neigbours complained about. I'm now expecting someone (Chorus, or contractor) to come and complete the installation on Tuesday the 5th.


TL:DNR Fibre now laid to edge of property, install scheduled for 5/11




"I have noticed even people who claim everything is predestined, and that we can do nothing to change it, look before they cross the road." -  Stephen Hawking




2001 posts

Uber Geek


  # 928471 7-Nov-2013 07:34
Send private message

Nearly done now (just the VOIP side at the ISP to be switched on and the phone wiring swapped over), Internet over fibre running fine, getting 94Mb/s and about 52 up.

A little bit frustrating with the coordination, or lack of, between ISP, Chorus, Downer etc, and knowing who will do what and when. In sayinh that, it has also given me an appreciation that each installation is a fairly complex undertaking with the various tasks requiring various skill-sets (I have had 8 different Downer techs visits at various times over the last 2 days) and how there are always a number of unknowns when the techs arrive so scheduling jobs with any accuracy must be near impossible.




"I have noticed even people who claim everything is predestined, and that we can do nothing to change it, look before they cross the road." -  Stephen Hawking


Create new topic



Switch your broadband provider now - compare prices


Twitter and LinkedIn »



Follow us to receive Twitter updates when new discussions are posted in our forums:



Follow us to receive Twitter updates when news items and blogs are posted in our frontpage:



Follow us to receive Twitter updates when tech item prices are listed in our price comparison site:





News »

Vodafone X-Squad powers up for customers
Posted 16-Oct-2019 08:15


D Link ANZ launches EXO Smart Mesh Wi Fi Routers with McAfee protection
Posted 15-Oct-2019 11:31


Major Japanese retailer partners with smart New Zealand technology IMAGR
Posted 14-Oct-2019 10:29


Ola pioneers one-time passcode feature to fight rideshare fraud
Posted 14-Oct-2019 10:24


Spark Sport new home of NZC matches from 2020
Posted 10-Oct-2019 09:59


Meet Nola, Noel Leeming's new digital employee
Posted 4-Oct-2019 08:07


Registrations for Sprout Accelerator open for 2020 season
Posted 4-Oct-2019 08:02


Teletrac Navman welcomes AI tech leader Jens Meggers as new President
Posted 4-Oct-2019 07:41


Vodafone makes voice of 4G (VoLTE) official
Posted 4-Oct-2019 07:36


2degrees Reaches Milestone of 100,000 Broadband Customers
Posted 1-Oct-2019 09:17


Nokia 1 Plus available in New Zealand from 2nd October
Posted 30-Sep-2019 17:46


Ola integrates Apple Pay as payment method in New Zealand
Posted 25-Sep-2019 09:51


Facebook Portal to land in New Zealand
Posted 19-Sep-2019 18:35


Amazon Studios announces New Zealand as location for its upcoming series based on The Lord of the Rings
Posted 18-Sep-2019 17:24


The Warehouse chooses Elasticsearch service
Posted 18-Sep-2019 13:55



Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.


Support Geekzone »

Our community of supporters help make Geekzone possible. Click the button below to join them.

Support Geezone on PressPatron



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.

Alternatively, you can receive a daily email with Geekzone updates.