#150153 13-Jul-2014 09:50
Send private message

Hi guys,

Chorus have finished laying UFB on our part of the street about a week or two ago and it's showing as live and covering our place on their map.

All of the automated checkers are saying it's available until we put in the apartment number (yes, I'm aware what a pain it is getting these installed). Telecom have come back saying no to us and Snap's website is also saying no. If I leave off the apartment number both of them say yes.

The building manager (fully onboard & keen to get it live) said Vodafone said yes it was available and has signed him up with them no problems.

Is this normal? Or really can we not get it due to being in a complex? (it's really just a bunch of townhouses, not a huge high-rise)

View this topic in a long page with up to 500 replies per page Create new topic
 1 | 2
Dynamic
3869 posts

Uber Geek

ID Verified
Trusted
Lifetime subscriber

  #1087990 13-Jul-2014 10:05
Send private message

Multi tenanted properties can be a minefield I understand.  If Vodafone are saying yes then just sign up with them.  There may well be multiple holdups, but at least you are then 'in the system' so some progress will be made even if it is slow.

You might need to be 'the buiilding UFB champion' pushing it through, making weekly calls to check on progress and helping things along.

I'm a litte envious.  Neither home nor work are on the current rollout plan.




“Don't believe anything you read on the net. Except this. Well, including this, I suppose.” Douglas Adams

 

Referral links to services I use, really like, and may be rewarded if you sign up:
PocketSmith for budgeting and personal finance management.  A great Kiwi company.




Peppery

919 posts

Ultimate Geek

Trusted

  #1087993 13-Jul-2014 10:14
Send private message

Yep, fully aware of how much of a pain it's going to be. In theory there's no reason why it's not available here, correct? Going to try signing up with Snap and seeing how that goes.

In the past two weeks it's gone live at home, work location 1 and location 2, and I suspect it's going to be a pain to get installed at pretty much all of them.

nitrotech
1285 posts

Uber Geek


  #1087994 13-Jul-2014 10:21
Send private message

If they only finished digging in the cables a couple of weeks ago then it won't be live for another 6-8 weeks and the RSP can't submit an order until it goes live.



Peppery

919 posts

Ultimate Geek

Trusted

  #1087995 13-Jul-2014 10:23
Send private message

The cables were dug and laid back in April/May

sbiddle
30853 posts

Uber Geek

Retired Mod
Trusted
Biddle Corp
Lifetime subscriber

  #1088005 13-Jul-2014 10:50
Send private message

MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.

richms
28192 posts

Uber Geek

Trusted
Lifetime subscriber

  #1088038 13-Jul-2014 12:27
Send private message

sbiddle: MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.


I hope that they disclose they are a technological black hole to anyone looking at purchasing in the buildings if they are refusing to pay the costs.




Richard rich.ms

NonprayingMantis
6434 posts

Uber Geek


  #1088055 13-Jul-2014 13:21
Send private message

richms:
sbiddle: MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.


I hope that they disclose they are a technological black hole to anyone looking at purchasing in the buildings if they are refusing to pay the costs.


I would think any sensible purchaser would look back through body corporate meeting minutes at a bare minimum for due diligence, and see it.

 
 
 

Trade NZ and US shares and funds with Sharesies (affiliate link).
richms
28192 posts

Uber Geek

Trusted
Lifetime subscriber

  #1088059 13-Jul-2014 13:38
Send private message

Wasting people's time getting to that stage. I wouldn't even want to go look at a place with a body Corp with that attitude.




Richard rich.ms

sbiddle
30853 posts

Uber Geek

Retired Mod
Trusted
Biddle Corp
Lifetime subscriber

  #1088061 13-Jul-2014 13:51
Send private message

richms: Wasting people's time getting to that stage. I wouldn't even want to go look at a place with a body Corp with that attitude.


Ultimately a body corp represents the people who own the apartments, and ultimately it's their money. Some hypothetical numbers I've heard being thrown around for building owner contributions are quite significant, and people who own the apartments really have the choice of paying that and having fibre, or not paying it and not having fibre.



Peppery

919 posts

Ultimate Geek

Trusted

  #1088065 13-Jul-2014 14:01
Send private message

Our BC is on board but as we don't have any numbers yet, bit hard to say how it'll be in the future.

The building is also less than three stories, so hopefully that helps.

networkn
Networkn
32358 posts

Uber Geek

ID Verified
Trusted
Lifetime subscriber

  #1088066 13-Jul-2014 14:05
Send private message

richms:
sbiddle: MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.


I hope that they disclose they are a technological black hole to anyone looking at purchasing in the buildings if they are refusing to pay the costs.


Over dramatic much?

deadlyllama
1264 posts

Uber Geek

Trusted

  #1089101 15-Jul-2014 09:56
Send private message

networkn:
richms:
sbiddle: MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.


I hope that they disclose they are a technological black hole to anyone looking at purchasing in the buildings if they are refusing to pay the costs.


Over dramatic much?


In ten years' time when the UFB rollout is complete, that won't be over dramatic.  If you chose to buy there now, you'd probably still be living there, with inferior and/or expensive broadband over copper.

sbiddle
30853 posts

Uber Geek

Retired Mod
Trusted
Biddle Corp
Lifetime subscriber

  #1089122 15-Jul-2014 10:12
Send private message

deadlyllama:
networkn:
richms:
sbiddle: MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.


I hope that they disclose they are a technological black hole to anyone looking at purchasing in the buildings if they are refusing to pay the costs.


Over dramatic much?


In ten years' time when the UFB rollout is complete, that won't be over dramatic.  If you chose to buy there now, you'd probably still be living there, with inferior and/or expensive broadband over copper.


In which case you'd be needing to raise the issue with the body corp. This isn't a Chorus issue - it's a body corp issue.



networkn
Networkn
32358 posts

Uber Geek

ID Verified
Trusted
Lifetime subscriber

  #1089126 15-Jul-2014 10:15
Send private message

sbiddle:
deadlyllama:
networkn:
richms:
sbiddle: MDU install processes are very complex - depending on the size of the complex your install time is anywhere from 6+ months to never.

Why do I say never? There are some buildings where the complexity of deploying fibre makes it incredibly complex and there are already rumours of some body corps are refusing the pay the costs associated with it.


I hope that they disclose they are a technological black hole to anyone looking at purchasing in the buildings if they are refusing to pay the costs.


Over dramatic much?


In ten years' time when the UFB rollout is complete, that won't be over dramatic.  If you chose to buy there now, you'd probably still be living there, with inferior and/or expensive broadband over copper.


In which case you'd be needing to raise the issue with the body corp. This isn't a Chorus issue - it's a body corp issue.




Exactly. The problem IS solve able, it's whether the owners can justify the cost. 


Peppery

919 posts

Ultimate Geek

Trusted

  #1093847 22-Jul-2014 18:41
Send private message

Update on this: Telecom weren't being totally truthful, signed up with Snap and the building manager got the Chorus MDU consent sent in today. Chorus called me to come by 20 minutes later (really!) and were on site within the hour. Speedy!

 1 | 2
View this topic in a long page with up to 500 replies per page Create new topic





News and reviews »

Air New Zealand Starts AI adoption with OpenAI
Posted 24-Jul-2025 16:00


eero Pro 7 Review
Posted 23-Jul-2025 12:07


BeeStation Plus Review
Posted 21-Jul-2025 14:21


eero Unveils New Wi-Fi 7 Products in New Zealand
Posted 21-Jul-2025 00:01


WiZ Introduces HDMI Sync Box and other Light Devices
Posted 20-Jul-2025 17:32


RedShield Enhances DDoS and Bot Attack Protection
Posted 20-Jul-2025 17:26


Seagate Ships 30TB Drives
Posted 17-Jul-2025 11:24


Oclean AirPump A10 Water Flosser Review
Posted 13-Jul-2025 11:05


Samsung Galaxy Z Fold7: Raising the Bar for Smartphones
Posted 10-Jul-2025 02:01


Samsung Galaxy Z Flip7 Brings New Edge-To-Edge FlexWindow
Posted 10-Jul-2025 02:01


Epson Launches New AM-C550Z WorkForce Enterprise printer
Posted 9-Jul-2025 18:22


Samsung Releases Smart Monitor M9
Posted 9-Jul-2025 17:46


Nearly Half of Older Kiwis Still Write their Passwords on Paper
Posted 9-Jul-2025 08:42


D-Link 4G+ Cat6 Wi-Fi 6 DWR-933M Mobile Hotspot Review
Posted 1-Jul-2025 11:34


Oppo A5 Series Launches With New Levels of Durability
Posted 30-Jun-2025 10:15









Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.