I live in a small block of units which has just this week had fibre installed. I'm a tenant so haven't been involved in the install process. Before I contact an ISP to arrange for an internal install I just wanted to make sure that the external install is actually finished. I was expecting an ETP that looked like this to be installed on the exterior of our flat. Instead there's this bad boy at the front end of the block, and a pipe running along the exterior of the block with a small box at each unit (this).
Is this install done, or is there another step that I should wait for before I request an interior install?
Follow-up question: if that box is the connection point, it's been installed directly behind a heat pump. Is that a problem, or can the installers route around and go through the wall in a different place?