For some months now Chorus has been installing fibre in Beachlands and I've been watching the Chorus Broadband Checker to have it installed as soon as it was available. It seemed like forever but on the 13th of May "Bingo" so I got on the phone directly to order from 2degrees.
Anyway, long story short, after several contacts with 2degrees it seems that there is no progress down to a "records" problem at Chorus. Didn't stop them putting a flyer through the letter box mind.
Hopefully someone at Chorus will sort it out quickly but six weeks seems like a long time to not even make contact on an order?