DST is due to end this year on the 6th April 08 (1st Sunday in April) - it was due to end on the 16th March 08 (3rd Sunday in March) prior to the DST changes put into effect last year.
The Okta Boss devices come with WM6 and are loaded with the Microsoft Corp. Extended DST Update.
Even with this patch all appointments (reoccurring and one offs) between 16th March to 6th April are showing 1 hour behind their scheduled time.
I've tried installing the lastest version of the DST update, tried removing the DST update from the Okta and installing afresh but to no avail.
Appointments were made after all workstations, exchange (all patches), mobile devices, outlook etc were updated. Through Outlook 03 or 07 the times are shown correct.
I'd hazard to guess there is a problem with the DST update on the Okta Boss as all other "views" into Exchange server calendar times are accurrate.
Any ideas?