Noodles
487 posts

Ultimate Geek
+1 received by user: 95


  #234927 13-Jul-2009 21:20
Send private message

I was also cabinetized. Went from 4Mbit/s down to ~1Mbit/s. Now I'm on UBS at 20Mbit/s. Thanks Orcon :)



cyril7
9075 posts

Uber Geek
+1 received by user: 2499

ID Verified
Trusted
Subscriber

  #235053 14-Jul-2009 09:55
Send private message

I was moved to the cabinet in a few days, still on my Home+ plan and now I am getting 14.4Mbps Cool


Thats very generous of them, well done Orcon.

Lets make it very clear, if you are connected via a cabinet when on Telecoms network and concider moving to either Vodafone Red or Orcon+ (ie ULL connection) then dont. You can still obtain a UBS connection from both those providers using the cabinet and retain higher connection speeds due to the advantage of a shorter tail length.

There is no tangible disadvantage to staying with a UBS connection (ie via Telecom) other than the fact that Voda or Orcon may have smaller backhaul to the Telecom interchange than they provide to their own DSLAMs in each exchange. However in the main centre areas where the Red network or Orcon+ exist I would suggest both those providers have plenty of bandwidth to the Telecom interchange, might be different in the wops but there you have little choice.

Cyril

alliao
321 posts

Ultimate Geek
+1 received by user: 19


  #235185 14-Jul-2009 15:05
Send private message

Cyril can you please elaborate on the shorter tail lengh?

That's actually what I'm trying to estabilish from my previous posts, whether people on LLU connection are indeed connected to the exchange further away?

(by moving customers onto telecom's cabinet whilest keeping them on Orcon+ sounds like hemorhage cash on orcon's side, as the traffic cost been charged to orcon from telecom will exceed that $2/GB orcon set out)



cyril7
9075 posts

Uber Geek
+1 received by user: 2499

ID Verified
Trusted
Subscriber

  #235311 14-Jul-2009 19:28
Send private message

Hi, tail length means the cable length from the DSLAM port to your modem. The whole purpose of cabnetisation (aka FTTN) is to move the DSLAM further out into the steets to reduce the cable or tail length.

FTTN (node) has been deployed by pretty much every Telco on the planet to help raise broadband connection speeds. There are two advantages to cabnetisation, firstly the tail length is reduced, this allows Telecom to meet its Guvment requested BB obligation of ensuring 80% of the populous can get broadband connection speeds of 10Mb/s or greater, the second is that it has meant the Telecom has now/soon deployed a FTTN network that has aggregation capacity between any DSLAM(Exchange or Cabinet housed) and Interchange point that exceeds the above requirement at potentially very good contention ratios.

Cyril

Athlonite
1828 posts

Uber Geek
+1 received by user: 210
Inactive user


  #239832 28-Jul-2009 17:33
Send private message

Telecom to meet its Guvment requested BB obligation of ensuring 80% of the populous can get broadband connection speeds of 10Mb/s or greater

yes such a shame it's going to take years for them to do it though when really there is no reason each city/town could be done all at once or is it more profitable to make us wait till October 2010

Ragnor
8279 posts

Uber Geek
+1 received by user: 585

Trusted

  #239882 28-Jul-2009 18:57
Send private message

I disagree, once they started Chorus have been rolling out cabinets are a pretty cracking pace they are actually ahead of their planned schedule last time I checked.

 
 
 

Want to support Geekzone and browse the site without the ads? Subscribe to Geekzone now (monthly, annual and lifetime options).
cyril7
9075 posts

Uber Geek
+1 received by user: 2499

ID Verified
Trusted
Subscriber

  #239953 28-Jul-2009 21:34
Send private message

I agree Ragnor, they are running a pretty tight schedule and seem to be ahead of it. I dont think I have ever seen the level of activity that the current work is running at in all my 30yrs of involvement in the Telecom/Broadcast industry, it should be applauded rather than slated.

Cheers
Cyril

Ragnor
8279 posts

Uber Geek
+1 received by user: 585

Trusted

  #239962 28-Jul-2009 22:01
Send private message

I just wish my area wasn't near the bottom of the list, but there has to be some kind of order.

Sounddude
I fix stuff!
1935 posts

Uber Geek
+1 received by user: 640

Trusted
2degrees
Lifetime subscriber

  #240042 29-Jul-2009 08:54
Send private message

when really there is no reason each city/town could be done all at once or is it more profitable to make us wait till October 2010


There is not enough Chorus/Transfield/Downers/Whoever resources in the country to pull that off!

They are rolling them out at a pretty good rate as it is.


old3eyes

9158 posts

Uber Geek
+1 received by user: 1364

Subscriber

  #240107 29-Jul-2009 12:58
Send private message

Sounddude:
when really there is no reason each city/town could be done all at once or is it more profitable to make us wait till October 2010


There is not enough Chorus/Transfield/Downers/Whoever resources in the country to pull that off!

They are rolling them out at a pretty good rate as it is.




It will be interesting to see if the roll-out continues at the current speed with Ozzy owners taking over allot of the old Downers/ Transfield work and maybe no staff..




Regards,

Old3eyes


1 | 2 
View this topic in a long page with up to 500 replies per page Create new topic








Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.