#139521 11-Feb-2014 21:18
Send private message

How long did it take to get your UFB installed from the date you placed your order?

I placed an order 2 weeks ago but I'm still waiting to be given a date by Ultra Fast Fibre. The Snap reps I've talked to seem to think it takes 5 working days for a date of install to be given by UFF.

View this topic in a long page with up to 500 replies per page Create new topic
 1 | 2 | 3
danfaulknor
974 posts

Ultimate Geek
+1 received by user: 533

Trusted
Prodigi
Subscriber

  #984533 11-Feb-2014 21:19
Send private message

3 months. Chorus screwed up the design 3 times and it was an MDU install.




they/them

 

Prodigi - Optimised IT Solutions
WebOps/DevOps, Managed IT, Hosting and Internet/WAN.




niallm90
123 posts

Master Geek
+1 received by user: 28

Trusted

  #984536 11-Feb-2014 21:23
Send private message

4 days. However I was moving into a new house that already had fibre. Though the ONT was missing, Chrous said the last tenants probably took it.

expression

236 posts

Master Geek
+1 received by user: 13


  #984538 11-Feb-2014 21:27
Send private message

danielfaulknor: 3 months. Chorus screwed up the design 3 times and it was an MDU install.


That does't fill me with much hope, although mine isn't a MDU.

The Snap FAQ states "5-10 working days". Pffft.



johnr
19282 posts

Uber Geek
+1 received by user: 2526
Inactive user


  #984539 11-Feb-2014 21:27
Send private message

Each install is different so you have asked a really opened ended question

expression

236 posts

Master Geek
+1 received by user: 13


  #984540 11-Feb-2014 21:29
Send private message

johnr: Each install is different so you have asked a really opened ended question


Indeed. I was after a range of responses.

Does the time vary between ISPs?

johnr
19282 posts

Uber Geek
+1 received by user: 2526
Inactive user


  #984541 11-Feb-2014 21:36
Send private message

Not ISP related at all the RSP does not do installs, Order goes from retail service provider to the wholesale service provider

 
 
 

Support Geekzone with one-off or recurring donations Donate via PressPatron.
System
521 posts

Ultimate Geek


  #984572 11-Feb-2014 21:58
Send private message

Been 3 weeks from the date it was ordered and haven't heard when we are supposed to see the technicians or anything yet. I can understand that installs will vary from property to property but shouldn't those variation occur after they have worked out what needs to be done at the property and not before? Surely 2-3 weeks after ordering to not have heard anything is unusual?




PC: 3.3ghz Core i5-2500, 8gb DDR3, ATI Radeon 5850, 27" QHD IPS Monitor

Mobile Phone: iPhone 5 32gb Graphite.


insane
3324 posts

Uber Geek
+1 received by user: 1006

ID Verified
Trusted
2degrees
Subscriber

  #984577 11-Feb-2014 22:01
Send private message

I'm at about two weeks and waiting. Had to prompt my neighbour to sign the shared driveway convsent letter, so hopefully it won't take much longer.

Incidently the same neighbour has been waiting 5 weeks total now for their install, but at least he's had Chorus come around to briefly check what needs to be done.

expression

236 posts

Master Geek
+1 received by user: 13


  #984578 11-Feb-2014 22:01
Send private message

System: Been 3 weeks from the date it was ordered and haven't heard when we are supposed to see the technicians or anything yet. I can understand that installs will vary from property to property but shouldn't those variation occur after they have worked out what needs to be done at the property and not before? Surely 2-3 weeks after ordering to not have heard anything is unusual?


Are you covered by Ultra Fast Fibre or another provider?

Oncop53
273 posts

Ultimate Geek
+1 received by user: 24


  #984580 11-Feb-2014 22:02
Send private message

  • 14/01/2014 Called Snap
  • 14/01/2014 Account active
  • 16/01/2014 Call from Chorus
  • 17/01/2014 FritzBox arrived
  • 28/01/2014 Chorus install

  The delay of a week or so was because I requested the install on the 28th, as we moved into our new house on the 27th.

theEd
341 posts

Ultimate Geek
+1 received by user: 26

Trusted

  #984588 11-Feb-2014 22:13
Send private message

3 months for one install, 5 months and counting for the other. Neither are MDUs.

 
 
 

Stream your favourite shows now on Apple TV (affiliate link).
expression

236 posts

Master Geek
+1 received by user: 13


  #984589 11-Feb-2014 22:15
Send private message

theEd: 3 months for one install, 5 months and counting for the other. Neither are MDUs.


Wow. Perhaps I should strap myself in and prepare for the long haul.

cjmchch
264 posts

Ultimate Geek
+1 received by user: 56


  #984668 12-Feb-2014 00:01
Send private message

7 days for me

Was with WxC and moved to Snap.

Ordered 24th December 2013 - Up and running on December 31st




 

 

 


System
521 posts

Ultimate Geek


  #984680 12-Feb-2014 00:47
Send private message

expression:
System: Been 3 weeks from the date it was ordered and haven't heard when we are supposed to see the technicians or anything yet. I can understand that installs will vary from property to property but shouldn't those variation occur after they have worked out what needs to be done at the property and not before? Surely 2-3 weeks after ordering to not have heard anything is unusual?


Are you covered by Ultra Fast Fibre or another provider?


I'm sorry I don't know what that means, the chorus availability tool says fibre is available and we have signed up for it through Orcon but that is as far as we have got, waiting to hear from them.




PC: 3.3ghz Core i5-2500, 8gb DDR3, ATI Radeon 5850, 27" QHD IPS Monitor

Mobile Phone: iPhone 5 32gb Graphite.


timmmay
20859 posts

Uber Geek
+1 received by user: 5350

Trusted
Lifetime subscriber

  #984707 12-Feb-2014 07:19
Send private message

Approximately four months. The indoors installation was done within a week of my request, but Chorus had no agreement to use Wellington Electricity poles for UFB delivery. This was a cause of delay for a lot of people in Wellington, I understand.

 1 | 2 | 3
View this topic in a long page with up to 500 replies per page Create new topic








Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.