We're looking to put in some irrigation, and the design means we'll need to run a decent length of some 24v cable to power some solenoids.
My google-fu is failing me, as I can't find if there's a minimum depth this needs to be buried (inside conduit). I can find the rules for 240V TPS, but am drawing a blank for 24V.
Thanks