Kitchen post is in below link.
http://www.geekzone.co.nz/forums.asp?forumid=141&topicid=175311&page_no=8#1387369
Received the second round of changes/pre-lims back today as well. If everything is alright with these changes then I can give the builders go ahead to get me pricing for the house which will be 90% of total build cost. 10% can only be done once full working drawings are done. This will give me the 4.5 hours balance left on changes that I can use if I need to change anything or scaled the house down if needed.