The install up our street was meant to be simple, well at least we thought. They had originally planned to mole tunnel up our street. They finally decided there wasn't enough room as there is a 11kV line running up the middle of the road. So they resorted to trenching up the street which has been nothing short of absolute shambles.
Basic summary:
- 150m long street, single lane
- 6th week into digging up the road
- blocked road every day for first 2 weeks with out telling us = couldn't get cars out
- occasional digging almost every week since
- fences and equipment dumped on garden, inside our driveway off the road
- parked vehicles in our drive way without asking, happy to let them so long as they ask
- used our hose (and water) without asking, damaged when returned, just dumped in front of our garage when it was originally hung tidily.
I guess the most annoying part thats made this a bad experience is the lack of communication from the contractors, not bothering to tell us anything, or simply being courteous.