![]() ![]() ![]() |
Bung: Agree that current code requires that size of Decktite to be mounted on a back flashing to the ridge but I have one formed into the corrugations that doesn't leak. The sealant goes between the roof and the EPDM flashing, it isn't smeared on after the flashing is secured.
https://steelandtube.co.nz/product/pur/publications/design/chimney-flashing-round-flue
Get a roofer in to fix it. The cost of a professional is much lower than the cost of doing it incorrectly and having to replace damaged timber / jib / etc.
![]() ![]() ![]() |