Geekzone: technology news, blogs, forums
Guest
Welcome Guest.
You haven't logged in yet. If you don't have an account you can register now.


JoeyNZ

15 posts

Geek


#245248 25-Jan-2019 17:21
Send private message

We are moving into a new home tomorrow. We are trying to get connected with BigPipe, but they told us they can't put in a connection order until after the current disconnect order goes through. It's apparently set to go through Feb 25th (a month away!). Is there any way to speed it up or get access to the existing fibre connection?

 

We have no contact with the previous tenants but are trying to ask the landlord for assistance. Thought I'd pop by here in case anyone has any good ideas. A month without internet isn't something we were expecting. We currently have Skinny 4G broadband currently but it says it is unavailable in the new area (plus we'd like to get fibre speeds and no caps). I suspect Skinny is oversubscribed in the new area is why.

 

We've asked Bigpipe if there is anyway to expedite the process, but they haven't responded yet. Hoping someone might have some other options or advice?

 

Thanks everyone,

 

--Joey


Filter this topic showing only the reply marked as answer View this topic in a long page with up to 500 replies per page Create new topic
 1 | 2 | 3
sparkz25
750 posts

Ultimate Geek
Inactive user


  #2167514 25-Jan-2019 17:30
Send private message

some times yes depending on what order has been placed for the existing connection and if its chorus or UFF you do have to wait, But if you call your ISP and tell them that they have to liven port 2 they should be able to do that and prioritize that, on chorus you should be able to liven it within 12 hours, on uff a day or 2 as they still have no api for the back end and it will have to be processes manually.




JoeyNZ

15 posts

Geek


  #2167517 25-Jan-2019 17:38
Send private message

Thanks, it's Chorus. What do you mean liven port 2? A second port on the fibre connection?


sparkz25
750 posts

Ultimate Geek
Inactive user


  #2167519 25-Jan-2019 17:41
Send private message

Yes so they should be able to liven eth2 on the ONT as your bigpipe connection



JoeyNZ

15 posts

Geek


  #2167520 25-Jan-2019 17:43
Send private message

Awesome, thanks so much!


michaelmurfy
meow
13254 posts

Uber Geek

Moderator
ID Verified
Trusted
Lifetime subscriber

  #2167576 25-Jan-2019 19:19
Send private message

Bare in mind port 2 can’t be a Gigabit connection.




Michael Murphy | https://murfy.nz
Referral Links: Quic Broadband (use R122101E7CV7Q for free setup)

Are you happy with what you get from Geekzone? Please consider supporting us by subscribing.
Opinions are my own and not the views of my employer.


  #2167579 25-Jan-2019 19:25
Send private message

can they not place an abandonment order?


JoeyNZ

15 posts

Geek


  #2167580 25-Jan-2019 19:34
Send private message

Port 2 can't be gigabit? Bah. Good to know.

I'll ask about abandonment order, thanks. Haven't heard back from big pipe so good to know.

 
 
 

Trade NZ and US shares and funds with Sharesies (affiliate link).
phantomdb
583 posts

Ultimate Geek

Lifetime subscriber

  #2167745 26-Jan-2019 09:58
Send private message

sounds like getting port 2 provisioned to get you up and going, then lodge a request to have the speed increased later.

 

or just plug into port one Ahem,,,,,,,,





[ SIGNATURE HERE ]


Aredwood
3885 posts

Uber Geek


  #2167765 26-Jan-2019 10:20

Figure out which ISP supplied the old tenants and sign up with them.

Or as said above, just use the old tenants Internet connection for now. As most ISPs don't require you to login for the connection to work. (port based auth) Just need to figure out pppoe or dhcp and vlan tag or not.





JoeyNZ

15 posts

Geek


  #2167775 26-Jan-2019 11:11
Send private message

Ah. I thought PPPoE needed user and pass. Thanks all. Will see today what works.

sparkz25
750 posts

Ultimate Geek
Inactive user


  #2167783 26-Jan-2019 11:24
Send private message

michaelmurfy: Bare in mind port 2 can’t be a Gigabit connection.

 

 

 

Port 2 can be a gig connection on either chorus or UFF,

 

The catch is on chorus you can only have one gig connection at any one time on any port on the ont.

 

So if the first port is livened as a 100m circuit you can liven the second as a gig port but that will be livened as a secondary circuit at a different rate, so when the primary circuit gets the disconnection put through the RSP will have to request to keep the secondary circuit live but now change this to the primary circuit for that ont.

 

But if the primary circuit is gig on port one on the ont you can only liven the second port to a maximum of 200mbit from memory until the disconnection order had gone through on the primary port then the secondary port can be re-provisioned as a gig circuit

 

UFF can liven ports 1 and port 2 as a gig connection, but the limitation there is that the ont up-link is only capable of handling 1 gig at any one time, so that means you cant get gig speeds on both ports at the same time, its one or the other.


JoeyNZ

15 posts

Geek


  #2167803 26-Jan-2019 11:51
Send private message

Big pipe says they can't liven port 2 since chorus has a disconnection order for end of Feb.

Previous tenants took the power cord for the chorus modem too. Sigh...

sparkz25
750 posts

Ultimate Geek
Inactive user


  #2167836 26-Jan-2019 12:39
Send private message

the end of feb seems a bit far fetched, i would have thought that as soon as the previous tenants had put the relocation order in it should have been disconnected

 

Jase2985:

 

can they not place an abandonment order?

 

 

they should be able to do this, has bigpipe got the correct address and ont serial number


JoeyNZ

15 posts

Geek


  #2167838 26-Jan-2019 12:45
Send private message

They told me disconnect order is 25 Feb so they can't put anything else on it. They haven't asked for the ont number but they have the correct address.

sparkz25
750 posts

Ultimate Geek
Inactive user


  #2167852 26-Jan-2019 12:56
Send private message

i wonder what would happen if the ont went missing? that surely would speed up the process lol as the old circuit would have been provisioned to the old ont


 1 | 2 | 3
Filter this topic showing only the reply marked as answer View this topic in a long page with up to 500 replies per page Create new topic





News and reviews »

Air New Zealand Starts AI adoption with OpenAI
Posted 24-Jul-2025 16:00


eero Pro 7 Review
Posted 23-Jul-2025 12:07


BeeStation Plus Review
Posted 21-Jul-2025 14:21


eero Unveils New Wi-Fi 7 Products in New Zealand
Posted 21-Jul-2025 00:01


WiZ Introduces HDMI Sync Box and other Light Devices
Posted 20-Jul-2025 17:32


RedShield Enhances DDoS and Bot Attack Protection
Posted 20-Jul-2025 17:26


Seagate Ships 30TB Drives
Posted 17-Jul-2025 11:24


Oclean AirPump A10 Water Flosser Review
Posted 13-Jul-2025 11:05


Samsung Galaxy Z Fold7: Raising the Bar for Smartphones
Posted 10-Jul-2025 02:01


Samsung Galaxy Z Flip7 Brings New Edge-To-Edge FlexWindow
Posted 10-Jul-2025 02:01


Epson Launches New AM-C550Z WorkForce Enterprise printer
Posted 9-Jul-2025 18:22


Samsung Releases Smart Monitor M9
Posted 9-Jul-2025 17:46


Nearly Half of Older Kiwis Still Write their Passwords on Paper
Posted 9-Jul-2025 08:42


D-Link 4G+ Cat6 Wi-Fi 6 DWR-933M Mobile Hotspot Review
Posted 1-Jul-2025 11:34


Oppo A5 Series Launches With New Levels of Durability
Posted 30-Jun-2025 10:15









Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.