xontech
268 posts

Ultimate Geek


  #1323367 12-Jun-2015 13:33
Send private message

Yes tiles on the walls, but fully waterproofed (by the tiler) and the use of Villa(?) board, not gib.

(edit - removed "so not a porous lining." before I got flamed) :-)



Disrespective
1925 posts

Uber Geek


  #1323453 12-Jun-2015 15:23
Send private message

Yeah, so the tiler will have used a membrane behind the tiles. 

See here: http://www.jameshardie.co.nz/productfiles/0185394001404957573.pdf Have a look at page 21 onwards for the wet area use. You can see that there is a waterproof membrane over the villaboard installed to manufacturers specification. The last part is important. Many products will not warranty their product if you have not used an approved applicator to install it. 

lissie
495 posts

Ultimate Geek


  #1324193 13-Jun-2015 20:23
Send private message

Just for price comparison purposes - just got our quote To gut approx 3.5 x 3 kitchen - remove a wall build a new wall remove one large window, one small one and an external door $65,000 - includes building new laundry at back of garage.  The bathroom about 1.8x 3.3m - gut and replace separate shower, bath, loo vanity, vinyl floor laminex walls - $33k .  

When we bought the house I thought it would cost around 10k for the  bathroom and 20k for the kitchen. We can make some savings like do the painting ourselfves, and maybe the demolitian - but I'm pretty bummed TBH 

Even the straightforward 65m2 deck - 0.5 m off the ground is not much change out of 40k 




I help authors publish their books - DIYPublishing.co.nz



mcraenz
1140 posts

Uber Geek


  #1324256 13-Jun-2015 22:13
Send private message

Have you asked for a break down of materials and labour? After martials what is the hourly rate for building work these days?






 

Help me build a better way of doing politics in Aotearoa New Zealand

 

 

 


lissie
495 posts

Ultimate Geek


  #1324259 13-Jun-2015 22:20
Send private message

Yup it's a detailed estimate by room - including PC sums for all fixtures, plumbing, electrical, painting and plastering.  The problem is, for example, the kitchen has $24k in the building which does include install of the kitchen cabinets, removal of one wall and building of one wall. Is that reasonable - I have no real idea- I had thought that a builder couldn't be more than $100/hr inc all overheads, but I dont' really know what things like nails and gib cost. 

Perhaps we have to take the risk and PM ourselves, hire a builder and source trades. It's a lot of work though - and tricky particularly for  the bathroom.




I help authors publish their books - DIYPublishing.co.nz

Disrespective
1925 posts

Uber Geek


  #1324260 13-Jun-2015 22:21
Send private message

For what it's worth, at the moment, standard builders rates vary from about $50-60 per hour for our full home projects. As for their margin, we negotiate from anywhere around 6% to 9%. We've had builders put on more though... In any case I can't imagine a renovation would alter those rates too much. 

lissie
495 posts

Ultimate Geek


  #1324272 13-Jun-2015 22:27
Send private message

Disrespective: For what it's worth, at the moment, standard builders rates vary from about $50-60 per hour for our full home projects. As for their margin, we negotiate from anywhere around 6% to 9%. We've had builders put on more though... In any case I can't imagine a renovation would alter those rates too much. 
 

How long should it take for a builder to remove a 3m long non-load bearing internal wall? A day? Just trying to get a feel for the actual work hours. Do you pay travel time on top of the hourly rate? 




I help authors publish their books - DIYPublishing.co.nz

 
 
 

Cloud spending continues to surge globally, but most organisations haven’t made the changes necessary to maximise the value and cost-efficiency benefits of their cloud investments. Download the whitepaper From Overspend to Advantage now.
Disrespective
1925 posts

Uber Geek


  #1324643 14-Jun-2015 21:47
Send private message

Travel time is negotiated but we wouldn't assume travel time to be allowed if the builder is based in the same city/region. 

There's too much unknown for me to say how long I think it would take to remove a wall that size. But if it was me, in my home, a couple of hours to remove the wall, then a few more hours to remediate the damaged ceiling and walls. The floor cleanup would depend on the flooring. It's really just a guy, a hammer, and maybe a reciprocating saw with a rubbish bin to dump the materials. 

PhantomNVD
2619 posts

Uber Geek
Inactive user


  #1324654 14-Jun-2015 22:30
Send private message

I read most of this thread in horror and fascination... I did the Reno of our last home almost entirely alone 7 years back (school teacher for ref) (ok Bach @84m2) and our 3mx3mbathroom came in (fully replumbed and relined) at just over $8000... Do the groundwork, do the buying, save the money .... Makes sense to me!

lissie
495 posts

Ultimate Geek


  #1324661 14-Jun-2015 22:56
Send private message

PhantomNVD: I read most of this thread in horror and fascination... I did the Reno of our last home almost entirely alone 7 years back (school teacher for ref) (ok Bach @84m2) and our 3mx3mbathroom came in (fully replumbed and relined) at just over $8000... Do the groundwork, do the buying, save the money .... Makes sense to me!
 

It's changed, a lot. I'm not sure when - but we did a very major remodel- moving rooms around - extension etc back in 2000 - and it was nothing like the cost we're looking at now. 

The thing is that for bathroom and kitchen  I want a legal, safe job - therefore the plumbing and electrician are non-negotiable. I've already nixed the tiles for vinyl and aqual panel. I will buy the appliances and get good prices shopping around.  We'll paint. But  all of that is only 1/2 the cost - the other 50% is basically building and PM of the trades. 




I help authors publish their books - DIYPublishing.co.nz

jonb

1771 posts

Uber Geek

Trusted

  #1337563 6-Jul-2015 08:41
Send private message

Quotes are coming in at around $10k each bathroom and $15k for kitchen.

Thinking of doing the stripping out ourselves to save 1-2k, are there are any gotchas involved in that? Also painting the kitchen as it's joined to the lounge which will need doing anyway afterwards.

Most likely getting custom kitchen units which will be about $8000 as they can work with the existing space much more efficiently.

jonb

1771 posts

Uber Geek

Trusted

  #1409781 20-Oct-2015 13:10
Send private message

Ordered the kitchen cabinetry now, ~$6500 including 30mm engineered stone worktop which seemed like a good deal (approx 4mx3m L-shaped kitchen plus corner pantry)  Also already purchased an induction hob and electric oven for $1300, just need a new fridge now. 

Can someone else who has done a kitchen break down the order of works to manage?  Will be installed late November, so need plumbing, electrical, extending an internal wall, splashbacks, then tiling.  Any other gotchas?  Will strip out existing ourselves, or put on trademe for someone to take away hopefully. 

Bathrooms to follow..

graemeh
2078 posts

Uber Geek


  #1409805 20-Oct-2015 13:47
Send private message

jonb: Can someone else who has done a kitchen break down the order of works to manage?  Will be installed late November, so need plumbing, electrical, extending an internal wall, splashbacks, then tiling.  Any other gotchas?  Will strip out existing ourselves, or put on trademe for someone to take away hopefully. 


I'd say do it in the following order:
1) Electrician and Plumber remove power outlets, switches, taps etc and leave them in a safe / non-leaking state
2) Demolition including removal of cabinets.
3) Builder builds stuff but leaves wall linings off
4) Electrician and Plumber re-arrange electrical and plumbing in wall (no outlets, switches taps etc installed yet)
5) Wall linings on, plastering/gib stopping done
6) Paint
7) Tile / floor coverings
8) Cabinets in
9) Take measurements for stone worktop, manufacture and install
10) Splashback in
11) Electrical and plumbing fittings installed

Done!

I'm assuming here that there will be some critical dimensions for the worktop so can only be made once the room is almost complete.  If this is not the case it can be manufactured earlier and installed with the cabinets.

You may also need a building permit to do this so also need to allow for inspections in these tasks.

Disrespective
1925 posts

Uber Geek


  #1409806 20-Oct-2015 13:50
Send private message

How fine grained info do you want to go?

- Strip it all out
- Frame up any new walls
- Prepare/fix existing flooring up to/under new cabinets. 
- Do plumbing and electrical
- Install new flooring (can be done any time before any new wall linings go on or cabinets go in if that's not an issue)
- Line and stop walls ready for paint/tiles
- Paint undercoat and first top coat on walls (So all that remains for any painting near new cabinetry is a top coat unless you're good at masking)
- Install cabinets/fixtures, toe plates etc
- Tile/install splashback

A few of those can be done at other times depending on whether you are happy to paint over or near new things, but essentially you've just missed out what you're doing with the floor from your note above. 



jonb

1771 posts

Uber Geek

Trusted

  #1409831 20-Oct-2015 14:16
Send private message

Thanks, that is just what I was wanting to get an idea of.  Aiming to keep the existing tiled floor and use some spare tiles as needed.

Worktops will be installed about a week after cabinetry installation, with that in mind how far in advance should the strip-out occur to enable building, electrical plumbing and painting?

1 | 2 | 3 | 4 | 5 | 6 | 7
View this topic in a long page with up to 500 replies per page Create new topic





News and reviews »

Air New Zealand Starts AI adoption with OpenAI
Posted 24-Jul-2025 16:00


eero Pro 7 Review
Posted 23-Jul-2025 12:07


BeeStation Plus Review
Posted 21-Jul-2025 14:21


eero Unveils New Wi-Fi 7 Products in New Zealand
Posted 21-Jul-2025 00:01


WiZ Introduces HDMI Sync Box and other Light Devices
Posted 20-Jul-2025 17:32


RedShield Enhances DDoS and Bot Attack Protection
Posted 20-Jul-2025 17:26


Seagate Ships 30TB Drives
Posted 17-Jul-2025 11:24


Oclean AirPump A10 Water Flosser Review
Posted 13-Jul-2025 11:05


Samsung Galaxy Z Fold7: Raising the Bar for Smartphones
Posted 10-Jul-2025 02:01


Samsung Galaxy Z Flip7 Brings New Edge-To-Edge FlexWindow
Posted 10-Jul-2025 02:01


Epson Launches New AM-C550Z WorkForce Enterprise printer
Posted 9-Jul-2025 18:22


Samsung Releases Smart Monitor M9
Posted 9-Jul-2025 17:46


Nearly Half of Older Kiwis Still Write their Passwords on Paper
Posted 9-Jul-2025 08:42


D-Link 4G+ Cat6 Wi-Fi 6 DWR-933M Mobile Hotspot Review
Posted 1-Jul-2025 11:34


Oppo A5 Series Launches With New Levels of Durability
Posted 30-Jun-2025 10:15









Geekzone Live »

Try automatic live updates from Geekzone directly in your browser, without refreshing the page, with Geekzone Live now.



Are you subscribed to our RSS feed? You can download the latest headlines and summaries from our stories directly to your computer or smartphone by using a feed reader.